Samstag, 5. September 2009
The crate
My father has build the crate frame for the transportation at the 25. of September. We tryed the size and the fixing of the bike onto the wooden bottom of the crate these days. I have to disassemble the front wheel to lower the front of the bike. Now we are looking for a stand to fix the front axle in a low position. One week before the bike leaves we will close the crate with thin wooden plate. After this, the crate will be transported by trailer to the airport Dusseldorf.
At the moment i am preparing my paperworks with the last handwritten notices in the maps of the countries i travel through. At the moment i am waiting for the last insurance contracts for the motorbike in the US and mexico.
Abonnieren
Kommentare zum Post (Atom)
Keine Kommentare:
Kommentar veröffentlichen